header image

Here’s What’s Happening on the Second Floor

Posted by: Joshua Minor | June 3, 2014 Comments Off |

bringing the gypsum from the truck into the library

Bringing the gypsum from the truck into the library.

hoses carrying the  gypsum

Hoses carryingthe gypsum.

the first area for the pour

First area for the pour.

continuing the first area

Continuing the first area.

pouring and leveling  the gypsum

Pouring and leveling the gypsum.

note the boots!

nice boots

leveling

prepping for the pour

laying out the bases for the carriages

Laying out and building the bases for the carriages.

beginning to build the carriages -

under: Uncategorized

Comments are closed.

Categories